(81) Page » Radioactive Waste Processing

JAVYS, a. s. operates two nuclear facilities for treatment and conditioning of radioactive waste.

(82) Page » Radioactive waste processing and treatment

Site:   Nuclear installation RAW Processing and Treatment Technology in Jaslovské Bohunice     Nuclear installation Final Processing of Liquid RAW in Mochovce References:   Slovenské elektrárne, a.

(83) Page » RAW and institutional RAW transport

(Radioactive and institutional radioactive waste transport) Solid or solidified RAW Fibre-concrete containers Institutional RAW and captured radioactive materials Transport is performed within the European Union,including services related to radiation and nuclear safety.

(84) Page » RAW and Institutional RAW Treatment and Conditioning

Bohunice RAW Treatment Center Sorting of RAW Thermal Treatment (Incineration) High Force Compacting Cementation Other Treatment Technologies Technologies for separation, fragmentation and decontamination ...

(85) Page » RAW incineration facility PS45

The RAW incineration facility PS45 is located at Jaslovské Bohunice site as a part of the Facility for Treatment and Conditioning of RAW in the premises of the existing building 809.

(86) Page » RAW Management

Types of Radioactive Waste Different types of waste are generated during operation and decommissioning of nuclear facilities - from normal municipal waste to very low level, low level, intermediate level and high level radioactive waste (RAW) in solid, liquid and gaseous form.

(87) Page » RAW Sources

There exist many illimitably important segments, which commonly work with radioactivity and radioactive materials. We speak about nuclear power engineering, industry, research, health care and number of others.

(88) Page » RAW Storage

To provide sufficient storage capacities there are the certified storages built in Jaslovské Bohunice.

(90) Page » Refuelling

The Reactor unit of a power plant is usually operated for extended time periods at full power. Once a year, a shutdown of the reactor unit is scheduled for refueling, inspections and maintenance. The energy contained in nuclear fuel is spent gradually.

1 «   4 . 5 . 6 . 7 . 8 . 9 . 10 . 11 . 12 . 13 . 14   » 27
V1 NPP Decommissioning A1 NPP Decommissioning Spent Nuclear Fuel Management Management of Institutional Radioactive Waste and Captured Radioactive Materials RAW Management Transport of RAW and SNF Commercial activities