(71) Page » Production of fibre-concrete containers

References:   Since 2001 the low level waste of all producers in the Slovak Republic that comply with the acceptance criteria has been stored in the fibre-concrete containers at the National Radioactive Waste Repository.

(72) Page » Program of Development of Deep repository in Slovak Republic

Works on the project of development of the deep geological repository started in 1994 and they were continuation of works performed in the former CSFR. The project is financed from the Government fund for liquidation of nuclear energy facilities and treatment of spent nuclear fuel and radioactive waste.

(73) Page » Progress in decommissioning process

Main activities of the V1 NPP decommissioning implementation: Tag-out activities and disconnection of systems, Implementation of projects – dismantling of unnecessary equipment and systems, Management ...

(74) Page » Project Changes and Reconstructions

The Initial Technological Improvements Project Changes The Initial Technological Improvements and Project Changes the addition of shielding cartridges for decreasing the neutron flow in the reactor’s ...

(75) Page » Provided Consultancy Services

Provided Consultancy Services Provision of consultancy services worldwide in the areas of: RAW Management Development and review of national strategies and programmes, RAW management plans, , technical and feasibility documents, licensing documentations.

(76) Page » Public participation process

The purpose of incorporating public participation into the decision making process is to increase the quality of decisions by creating and implementing possibilities for project acceptance from various points of view.

(78) Page » Radiation Protection

All relevant activities in the field of radiation protection are, before their approval and in course of their implementation, subject to dose rate optimization process in line with effective legislation and internal quality assurance system of company JAVYS, a.

(79) Page » Radioactive waste characterization

Site:   Jaslovské Bohunice References:   JAVYS Legislation:   Stipulates criteria of the acceptance of very low and low level RAW in the repository.   1. DESIGN AND IMPLEMENTATION OF RAW CHARACTERIZATION SYSTEM Elaboration of RAW characterization procedure Setting the reference radionuclides necessary for the determination of the activity of the radionuclides dificult to measure.

(80) Page » Radioactive Waste Characterization

Provision of RAW characterization services is primarily related, but not limited to the RAW treated and conditioned on Jaslovské Bohunice site.