(41) Page » Increasing Nuclear Safety

Ever since the beginning, a high operational safety standard was maintained at the V1 nuclear power plant. A perfect knowledge of the facility, technical competence and qualified approach reflected on the proposed and the realized changes.

(42) Page » Information Center

The company JAVYS invites all persons interested in the field of nuclear power industry to visit a new information center near V1 NPP site in Jaslovské Bohunice. During a free tour you can watch a 3D movie about V1 NPP decommissioning and look at the models of V1 NPP, reactor WWER 440 or Bohunice site and see other interesting exhibits.

(43) Page » Information on personal data processing for Contractors

In connection with processing of your personal data by company Jadrová a vyraďovacia spoločnosť, a.s.

(44) Page » Information on personal data processing for public and visitors

In  connection with processing of your personal data by company Jadrová a vyraďovacia spoločnosť, a.s.

(45) Page » Information on public consultation process

Not relevant events ongoing currently.

(46) Page » Information on public hearings

Not relevant events ongoing currently.

(47) Page » Integral RAW storage facility

The reason for the preparation of the realization of the integral RAW storage facility is the securing of storage of solid waste, treated using various technologies, from the decommissioning of nuclear facilities, until these can be reintroduced back into the environment, or transported to the site of their definitive storage.

(48) Page » Integrated Management System

An Integrated Management System (hereinafter referred to as “IMS”) is a management system, in which each employee has his/her specific position, tasks, competencies, responsibilities and appropriate powers/authority.

(49) Page » Interim Spent Fuel Storage (ISFS)

During the process of spent nuclear fuel management (SNF), the company JAVYS, a. s. ensures provision of services concerning storage, manipulation and monitoring of SNF. The company is the owner and operator of the nuclear facility Interim Spent Fuel Storage.

(50) Page » Interim storage of radioactive waste

Interim storage of radioactive waste (IS RAW) on the site of Jaslovské Bohunice is another completed BIDSF project implemented within the process of the V1 nuclear power plant decommissioning. By implementing this project, the JAVYS, a.